Demolition case study - Havant

Date: 06/07/2017

Key Facts

  • Soft strip and demolition of 2 and 3 storey precast concrete system built school.
  • Works conducted next to a live school building.
  • Asbestos based materials removed and disposed of to suitably licensed waste disposal sites.
  • Previously temporary supported due to failure of precast concrete system.


 

  • Location: Havant
  • Duration: 10 weeks