Case Studies / Harlington School, Middlesex, Earthworks

Harlington School, Middlesex, Earthworks

Following our successful performance on the initial demolition works, R Collard were awarded the subsequent enabling and earthworks package. This comprised of the cut and fill to formation level and the installation of 400mm of engineered fill in preparation for a new football pitch.

The cut and fill to formation consisted of circa 3000m3 of material placement, to achieve levels as per the design drawings issued with compaction achieving the destined CBR level at formation. Surface water drainage was adapted and where needed, new installed.

Summary of the Scope of Works:

Clear working area of all anthropogenic materials.
Import suitable subsoil materials to achieve design subsoil formation levels.
Grade and firm subsoil over specified area to design slopes.
Incorporate pipe drainage system and connect to outfall.