Harlington School, Middlesex, Demolition

R Collard were delighted to be awarded the demolish package at Harlington School, Middlesex. The project involved the demolition and asbestos removal of the existing large secondary school building down to ground, followed by the removal of all foundations and hard standings. The demolition works were tendered to make way for the building of a brand-new educational facility. Following our successful performance on the initial demolition works, R Collard were awarded the subsequent enabling package. This comprised of the cut and fill to formation level and the installation of 400mm of engineered fill in preparation for a new football pitch.

Summary of the Scope of Works:

Asbestos Removal.
Soft Strip of the existing building.
Demolition down to ground.
Removal of all foundations to 2m deep.
Removal of all hard standings down to 200mm.
Removal of all arising off-site.
Excavate underground duct structures, lift pits and hard standings of varying finishes.