We use cookies to give you the best experience on our website - if you are happy click acknowledge & accept. Alternatively, you can find more information in our
privacy policy
.
Acknowledge & Accept
Search R.collard
T:
01252 844688
E:
info@rcollard.com
Log In
Basket
Main:
01252 844688
Reading:
0118 959 0252
Wokingham Scrap:
0118 979 5987
Email:
info@rcollard.com
Search
Menu
Home
About Us
Our Services
Our Sectors
Skip Hire
You are here:
News and Media
News Archive
Collard Racing News May 2018
Collard Racing news - May 2018
Date: 15/05/2018
Rob Collard has been busy completing high speed passenger laps at Donington in the BMW M140i and then racing at Donington in very difficult conditions. Rob still managed to be the highest scoring BMW and rear wheel drive driver with a 13
th
, 10
th
and 4
th
place narrowly missing out on a podium. The next round of the BTCC is at Thruxton on 27
th
May.
Ricky Collard experienced a difficult weekend in the M6 GT3 at Monza. He was very fast in practice and qualifying but a mechanical failure ended his racing. Ricky has also been busy doing high speed passenger laps in the M4 DTM at Hockenheim. Next up for Rick is Blancpain at Silverstone on 19
th
/ 20
th
May.
Jordan Collard continued his impressive start to the season with a 4
th
place in race one and a second place in race two at Rockingham Motor Speedway winning the Rookie class in both races which leaves him in second place in the Championship.
Jordan had the fastest lap in race one securing extra points which leaves him comfortably ahead of third place and in a very strong position. Jordan is also leading the Rookie Championship. The next outing for Jordan will be on Saturday 26th and Sunday 27th May at Snetterton where the youngest racing Collard will be celebrating his 18
th
birthday.
Enquire Now
Call us: 01252 844688
Robert Collard
Ricky Collard
Jordan Collard
Picture and Video Gallery
Case Studies
Demolition case study - Fleet
The project comprised of asbestos removal, soft strip and demolition...
read full article >
Demolition case study - Thamesmead Estate
read full article >
Demolition case study - Havant
read full article >
Other Services
Other Services
Navigate to other services:
Select a Service
Demolition
Skip Hire
Transport
Earthworks
Aggregates
Waste Management
Scrap Metal
Asbestos Removal
Material Trading
Ready Mix Concrete
Skips & Containers
Grab Loading Hire
Rubbish & Waste Collections