We’ve had some heartwarming feedback from our work at Bracknell Beeches, citing our team as “always courteous and professional, tending to our every need” with the site consistently scoring high in regular safety visits.
Our client made special mention of Cristian Radu, site manager: “The site layout and setup were of high standard and was maintained throughout the demolition works. I was impressed by the safety culture observed and the situational awareness of the workers too. The team operated like a well-oiled machine, where everybody knew what to do and when.”
We took the utmost care delivering our soft strip, asbestos removal, structural demolition and earthworks services next to an operating railway line to prepare the land for a new development.
We’re delighted to maintain our leading position in the industry with a range of contracts, get in touch with us today to find out how we can help!