Case Studies

We have a number of case studies for you to view and download.  Please visit the site News Archive for more case studies that may be more specific to your requirements.

 

Demolition case study - Maidenhead
16/07/2019
The scope of this project included the demolition of a two storey existing office and warehouse unit plus the grubbing up of associated concrete slab and foundations to a depth of 2 metres....
View Case Study
Skip Hire Case Study - Aldershot
20/08/2019
At R Collard, we’re proud to offer a wide range of essential services to businesses and charities in the local area. We were recently proud to help Parkside (Aldershot & District Learning...
View Case Study
Demolition case study - Fleet
17/05/2019
The project comprised of asbestos removal, soft strip and demolition of the former Hart Leisure Centre, in the busy town of Fleet. Key Facts Securing of the site – inspect hoarding...
View Case Study
Demolition case study - Bristol
06/07/2017
Key Facts Demolition of former hospital occupying an approx 20Ha site including asbestos removal and limited remediation Operational medical facilities adjacent and local community to all...
View Case Study
Demolition case study - Addlestone
06/07/2017
Key Facts Demolition of two storey shops with flats above. Demolition of traditional masonry built 4 storey block of maisonettes. (The structure was attached to an adjacent block by an...
View Case Study
Demolition case study - Havant
06/07/2017
Key Facts Soft strip and demolition of 2 and 3 storey precast concrete system built school. Works conducted next to a live school building. Asbestos based materials removed and disposed of...
View Case Study
Demolition case study - Deepcut
19/09/2017
Key Facts Complete demolition of former primary school. Works located close to residential housing estate. Asbestos based materials removed and disposed of to suitably licensed waste...
View Case Study
Demolition case study - Maidenhead town centre
19/09/2017
Key Facts Demolition of 6 storey council office building and formation of temporary car park Town centre location next to the river Thames Existing ground floor slab and car park area...
View Case Study
Demolition case study - Aldershot
19/09/2017
Key Facts Demolition of 9 blocks of 3 storey flats The main structures were 3 storey traditionally built pitched roof, masonry walled, concrete beam and block floored residential flats with...
View Case Study