Bouygues (Construction Company)
06/07/2017
Key Facts Demolition of two storey shops with flats above. Demolition of traditional masonry built 4 storey block of maisonettes. (The structure was attached to an adjacent block by an...
View Case Study
BAM
06/07/2017
Key Facts Soft strip and demolition of 2 and 3 storey precast concrete system built school. Works conducted next to a live school building Asbestos based materials removed and disposed of...
View Case Study
Osbourne
19/09/2017
Key Facts Complete demolition of former primary school. Works located close to residential housing estate Asbestos based materials removed and disposed of to suitably licensed waste...
View Case Study
Royal Borough of Windsor & Maidenhead
19/09/2017
Key Facts Demolition of 6 storey council office building and formation of temporary car park Town centre location next to the river Thames Existing ground floor slab and car park area...
View Case Study
First Wessex Homes (Housing Association)
19/09/2017
Key Facts Demolition of 9 blocks of 3 storey flats The main structures were 3 storey traditionally built pitched roof, masonry walled, concrete beam and block floored residential flats with...