Case Studies / Bracknell Beeches, Bracknell

Bracknell Beeches, Bracknell

The site comprises of 4.3 hectares and is located just off of Old Bracknell Lane West, 300m to the south of the town centre.

The project involved the demolition of the existing buildings on site to allow for the erection of 7 new buildings comprising of 349 residential dwellings and commercial floor space.

The groundwork side of this project consisted of the construction of the foundation for the marketing suite including all remediation, groundworks, services, and storm and foul drainage.

The demolition phase included the soft-strip of the site, stock piling of materials for re-use, Asbestos Management, Remediation, Earthworks and Civils.

Summary of the Scope of Works:

Soft Stripping of all debris, loose fittings and furnishings
Demolition of existing buildings on-site to ground level
Identification and location of all asbestos containing materials before removal and safe disposal
Liaison with the client regarding known services positions, site clearance works and current conditions
Services investigations including identifying all live services, their disconnection and cutting-back to site boundary and protective requirements to existing services
Services investigations including identifying all live services, their disconnection and cutting-back to site boundary and protective requirements to existing services
Liaison with the client regarding the proximity of Network Rail's infrastructure.