Case Studies / 230 Bath Road, Slough

230 Bath Road, Slough

The project included the total demolition, soft strip and asbestos removal of a former 1980’s 4 storey office block down to slab level. A pharmaceutical and research facility was less than 10m adjacent to the eastern side of 230 Bath Road structure. Due the nature of the research, their scientific equipment was particularly sensitive to noise and vibration.

Constant communication between both management teams was imperative to ensure the safety of their staff and facility equipment was safe and maintained at all times.

Summary of the Scope of Works:

Internal soft strip of structure
Removal of internal asbestos
Demolition of 4 storey structure to ground slab level
Real time alerted system, Dust, Noise and Vibration monitoring
Temporary demolition curtain along the eastern & southern end of site Removal of all vegetation on site
Installation of temporary car park to the north end of site
Removal of all demolition arisings from site
Installation of black V-Mesh fencing to temporary car park